From the mean of and the total mumbe of trimming, it is healthy to say that the two operatiors
Name
Professor
Course
Date
MANF
Q14) From the mean of and the total mumbe of trimming, it is healthy to say that the two operatiors are nkt tromining of the same part. The numbwer of parts trimmed by MARY IS 13.1668, while the total number of trimming done by jack is 13.0815. this is to say that ,ary is mr eficienty at trimming than jack. On the other hand, JACLS HISTOGgram is skewed postively while that of mary is not normaly dustributed. Sufice to day that the CPC, CPK control chrt Of jack is nt stable
Question number 15)
Observed Expected Z
PPM<LSL 0.0 0.2 -5.119
PPM>USL 0.0 2.7 4.550
PPM 0.0 2.8 % Defects 0.0 0.0 According to the data provided form the CNC turning centre, the level of production is negatively skewed, the standard deviation is 0.006
Decimal Points 3.000
Unit of Measure 0.001
Number of Entries 30
Average 0.012
Stdev 0.006
Median 0.011
Mode 0.020
Minimum Value 0.002
Maximum Value 0.020
Range 0.018
LSL -0.020
USL 0.040
Number of Bars 5.000
Number of Classes 4.000
Class Width 0.005
Beginning Point -0.025
Stdev Est 0.006
d2/c4 1.128
Target 0.01
..
Cp 1.611
Cpk 1.517
CpU 1.517
CpL 1.706
Cpm 1.683
Cr 0.621
ZTarget/Z 0.311
Pp 1.763
Ppk 1.659
PpU 1.659
PpL 1.866
Skewness -0.009
Stdev 0.006
Min 0.002
Max 0.020
Z Bench 4.538
% Defects 0.0%
PPM 0.000
Expected 2.841
Sigma 6.040
Q 17) data x=16 minutes, S=3 minutes, R=7 minutes., duration 320 daya ,, sample 5
X charts UCL=16+3X7=37
LCL=16-3X7=-4
R charts =UCL=>9X7=63
LCL=>9-7=2
Q#18) According to the x chart , the process isn perfectly in ocntrol, as the conyrol level is just within the nmargin of safety of tye upper contrio limit and the lower control limit, from the x chrat, is is open that mlost of the points are close to the average, while a few points occur near the control limits. Additionally, there are No points beyond the control limits. This is a sin of a process within the control limit. howevwe, from the r charts, the process is not stable . The R charts shows that the process was highly variable . never thelss, if the avarage fill is 50.0 pound, that wil be slihtly above the process, and so out of the process control. However, the variability of the process will accommodate that thouh not stable .
Q#19) The pltted avarages and ranges shows that the thermometers produced in te factory are conforming to the oreset control limts, most of the thermometers have a very hih level of [recision as their data appear close to the controllimit. The process on the other hand is variable as there are some process that are closer to the lower control limit.
X chart
R Charts